Business Studies

Please rewrite case study answers in your own words and add 4 sources in APA format with Doi:

1) Why does L5 incur higher manufacturing and logistics costs than L6? What are some of the costs that are incurred in L5 but not in L6? Are there any costs that apply to only L6 but not L5?

Don't use plagiarized sources. Get Your Custom Essay on
Business Studies
Get an essay WRITTEN FOR YOU, Plagiarism free, and by an EXPERT!
Order Essay

L5 incurs higher manufacturing and logistics costs than L6 due to the chassis being shipped separately after the motherboard, which creates separate costs for each. This forces Dell to rely on 3rd-party integrators, which increases costs and can create disruptions in the supply chain. In L5, the chassis is shipped via water and the motherboard is shipped via airfreight, which adds costs and can delay the units being customized and ready to ship to the customer for its final stages in L10 manufacturing. For example, in 2005, 60% of the L5 manufacturing caused disruptions in the supply chain as the motherboards were not available
in a timely manner due to the chipset supplier being unable to deliver the amount needed. In the L6 process, the supplier, such as the contract manufacturer in China, installs the motherboard in the chassis, which is not a part of the L5 process. The unit is then shipped via water and arrives at Dell’s factories for the final customization stages until the unit reaches L10. As a result, manufacturing and logistics costs are lower for L6 due to the China integration stage as the airfreight transportation costs are eliminated, reduces the motherboard packaging costs, and Dell is able to efficiently manage their inventory.

2) Which of the six proposed manufacturing solutions should Dell implement, based on the survey result? Why? What are the pros and cons of this recommendation?

Of the six proposed manufacturing solutions, Dell should implement Option 3A due to it having the lowest manufacturing complexity and reduced manufacturing costs. Integrating the chassis and motherboard at the supplier logistics center will not have a major impact to the existing process as Dell will be able maintain its current L6 to L10 manufacturing processes, and it will help to drive low capital expenditure. The cost per box will decrease from $10.07 to $7.54 as a result of opting for Option 3A. It is drastically less complex for its worldwide procurement and its overall supplier quality engineering; however, its cost accounting is the most complex factor. In addition, Option 3A will also require additional production and inventory overhead control. Option 3A adds value to Dell’s processes as it gives Dell more control of the 3rd-party integrators, it helps Dell maintain their costs by avoiding the need to acquire additional facilities, and it avoids disruptions to the overall supply chain.

3) How easily sustainable is your recommendation for the previous question if the chipset supply shortage further deteriorates?

Out of the six proposed manufacturing solutions, Option 3A would be the easiest for Dell to sustain. Ideally, it will reduce the lead time and align more efficiently with consumer demand; however, if the chipset supply shortage further deteriorates, none of these options will be sustainable enough to avoid production delays. This is due to the chipset being an essential component to the motherboard as the motherboard cannot be manufactured without the
chipset, and its integration occurs prior to the L5 and L6 manufacturing stages. As a result, there will be delays to the production of the desktop PC; however, Option 3A would be the most suitable solution due to its worldwide procurement and better supplier quality engineering overall. It will inhibit increased production capacity and help to strengthen the supply chain. It
also allows Dell to control and work with different suppliers in order to maintain their forecasted inventory and avoid increased lead times. Dell’s relationships with the suppliers will help it to better manage such shortages as they arise by sharing data to plan ahead to ensure that the suppliers can maintain their processes utilized, which helps Dell to meet the expected demand. This approach also allows the supplier to be held accountable if there are chipset
shortages or defects. Dell can impose a penalty system for their suppliers in these scenarios, and it can be flexible to also seek new suppliers in order fulfill their orders in a timely manner.

4) How good is the methodology employed by the BPI team to determine the optimal manufacturing option for Dell? Are there more effective approaches?

The methodology employed by the BPI team was skillfully carried out as it captured the feedback from the content experts within each affected department, and it accounted for the complexity and costs incurred for each option. Their involvement in the daily processes helps Dell to better understand the issues impacting the overall supply chain, and it allowed the company to quantify the six proposed manufacturing solutions. Dell can implement a push-pull strategy since the company “pushes” its customization options to its consumers, and it will utilize each order to “pull” the demand within its supply chain. This means that the amount of the main components produced, such as the L6 manufacturing stage, is directly dependent upon the consumer demand, and the end product varies based upon the customization requirements received for each order. Dell should review the location of their suppliers to
compare the operational costs each accrues in order to determine whether regional or international suppliers can improve operational effectiveness. In addition, Dell can implement a penalty system for its suppliers when they are unable to produce their part of the process as expected. This will ensure that the suppliers plan efficiently to avoid shortages in their stages.

5) How can Dell effectively address the root causes contributing to the increase of L5 manufacturing?

Dell can effectively address the root causes contributing to the increase of L5
manufacturing by ensuring that the motherboards are provided to the CMs in a timely manner. This will have a direct impact on the lead times incurred since it drives the timeliness for the end product being completed. For the fluctuating demand, Dell should improve its forecasting to better align the supply with it. The company should utilize multiple chipset suppliers to prevent disruptions in production. This approach will also reduce costs as it gives Dell more
bargaining power by having multiple suppliers. Dell’s suppliers should have contractual agreements where penalties are accrued if the expected supply of a unit is not provided and collaborate with the suppliers with incentives to help reduce the lead time. The suppliers should be held accountable for any chipset defects in order to help improve the quality and engineering issues. As a result, the suppliers should add a quality check to their current process. Also, the suppliers should maintain a buffer stock in case shortages arises in the supply chain to avoid disruptions to it. As a result, Dell will be able to maintain its competitive advantage with the increase of L5 manufacturing.

ANSWER

Case Study Questions

 

Question 1

The manufacturing and logistics costs of L5 are higher than L6. This is because the chassis was shipped separately after the motherboard, which led to a separate cost for each. Dell has been forced to rely on 3rd party integrators, which has led to disruptions and increased supply chain costs. Dell will continue to raise the manufacturing costs due to the utilization of L5 manufacturing. Some of the costs incurred in L5 that were not in L6 include the airfreight for the motherboard, separate logistic costs for chassis, motherboards, third-party integrator. The L5 motherboard was shipped through airfreight which increased the cost and delayed the units being customized for shipping to the consumer for the final stage of L10 manufacturing. Relative to L6 manufacturing, the level of L5 manufacturing began to increase quite significantly in March 2005. For instance, in 2005, about 60 percent of the L5 manufacturing caused disruptions in the supply chain. The cost incurred in L6 but not in L5 was assembling the L6 desktop PC chassis in China. The differences in logistics and manufacturing costs for L6 and L5 show Dell’s problem due to high logistics and labor costs. The manufacturing and logistics cost influence the supply chain costs (Li et al., 2014). Therefore, Dell has to ensure a tactical, logical, strategic, and operational supply chain. Poor supply chain planning leads to the high cost of unfinished goods and ineffective deployment of resources.

Question 2

Dell needs to focus on Option 3A: integration at the supplier logistics center/hub solution since it has a minimal complexity score. The logistics hub will coordinate the needs of varying channels by developing a unified distribution center. Option 3A will facilitate ongoing logistic issues because it has a greater logistics score and offers the most efficient approach to lower the manufacturing lead time and cost. Integrating the motherboard and chassis at the supplier logistics center will not affect the current process since Dell will maintain its manufacturing process from L6 to L10. As a result of Option 3A, Dell will lower the capital expenditure, and the cost per box will drop to $7.54. Option 3A will be more accessible for Dell to sustain and align more efficiently with the needs of the consumers. However, the limitation of Option 3A is that it will need an additional inventory and production overhead control.

Question 3

Considerably, deterioration in the chipset supply shortage will lead to delays in other solutions in the manufacturing process. Out of the six proposed manufacturing solutions, Option 3A is the most suitable for Dell. This will lead to reduced lead time and alignment with consumer needs. However, the deterioration of the chipset supply shortage will lead to none of the solutions addressing the supply chain issues since they are not enough to avoid production delays. The chipset is a significant component of the motherboard since it cannot be produced without the chipset, and integration occurs before L6 and L5 manufacturing phases. However, option 3A remains the most suitable due to its better supply and procurement quality, thus helping strengthen the supply chain.

Question 4

The methodology utilized by the BPI team to examine the optimal manufacturing for Dell is highly effective. This is because the BPI team considers and integrates the costs linked with the company in their decision-making. The BPI team has reviewed individual impacts to determine which one will impact the varying complexity in Dell. The BPI relies on a methodology that allows Dell to understand the overall effects in the supply chain and quantify the six proposed manufacturing solutions. Dell can also implement the pull-push strategy to manage the supply chain. The pull-push approach means that decisions about the shipped and manufactured products are determined through anticipated consumer demand (Barbara and Rosario, 2014). It uses flexible materials with varying consumer demands rather than having a fixed material list in the manufacturing process.

Question 5

Dell will address the root cause through a customer management system to ensure accurate forecasting. Accurate forecasting can help reduce lead time and demand fluctuation (Jordan and Messner, 2020). Dell should focus on improving its supply chain forecasting to align consumer demands effectively. Proper planning in demand should be addressed to identify systematic mistakes, reduce lead times and increase production. Dell should have a contractual agreement where penalties for the shortage are accrued. Collaboration with suppliers will also reduce the lead time and prevent disruptions in production (Ramanathan and Gunasekaran, 2014). The BPI team can enable Dell to make its decisions and offer the best possible solutions to address the root cause of increased L5 manufacturing cost.

 

 

References

Barbara, L., & Rosario, T. (2014). Towards an adapted lean system – a push-pull manufacturing strategy, Production Planning & Control, 25:4, 346-354, https://doi.org/10.1080/09537287.2012.702867.

Jordan, S., & Messner, M. (2020). The use of forecast accuracy indicators to improve planning quality: Insights from a case study. European Accounting Review, 29(2), 337-359. https://doi.org/10.1080/09638180.2019.1577150

Li, X., Tang, O., Liu, W., & Sun, X. (2014). Discrete and dynamic optimization problems in operations management 2014. Discrete Dynamics in Nature and Society, 2014. https://doi.org/10.1155/2014/701938

Ramanathan, U., & Gunasekaran, A. (2014). Supply chain collaboration: Impact of success in long-term partnerships. International Journal of Production Economics, 147, 252–259. https://doi.org/10.1016/j.ijpe.2012.06.002.

 

 

 

Homework Sharks
Order NOW For A 10% Discount!
Pages (550 words)
Approximate price: -

Our Advantages

Plagiarism Free Papers

All our papers are original and written from scratch. We will email you a plagiarism report alongside your completed paper once done.

Free Revisions

All papers are submitted ahead of time. We do this to allow you time to point out any area you would need revision on, and help you for free.

Title-page

A title page preceeds all your paper content. Here, you put all your personal information and this we give out for free.

Bibliography

Without a reference/bibliography page, any academic paper is incomplete and doesnt qualify for grading. We also offer this for free.

Originality & Security

At Homework Sharks, we take confidentiality seriously and all your personal information is stored safely and do not share it with third parties for any reasons whatsoever. Our work is original and we send plagiarism reports alongside every paper.

24/7 Customer Support

Our agents are online 24/7. Feel free to contact us through email or talk to our live agents.

Try it now!

Calculate the price of your order

We'll send you the first draft for approval by at
Total price:
$0.00

How it works?

Follow these simple steps to get your paper done

Place your order

Fill in the order form and provide all details of your assignment.

Proceed with the payment

Choose the payment system that suits you most.

Receive the final file

Once your paper is ready, we will email it to you.

Our Services

We work around the clock to see best customer experience.

Pricing

Flexible Pricing

Our prces are pocket friendly and you can do partial payments. When that is not enough, we have a free enquiry service.

Communication

Admission help & Client-Writer Contact

When you need to elaborate something further to your writer, we provide that button.

Deadlines

Paper Submission

We take deadlines seriously and our papers are submitted ahead of time. We are happy to assist you in case of any adjustments needed.

Reviews

Customer Feedback

Your feedback, good or bad is of great concern to us and we take it very seriously. We are, therefore, constantly adjusting our policies to ensure best customer/writer experience.